projects bidding

Access the Full Project by Clicking here!
Bidjugde
JOB
Frank Luke Additions Phase 1 Demolition and Abatement - REBID
BID DATE
06/14/11 - 2:00 LIVE!
AGENCY
City of Phoenix
ESTIMATE
$800,000
SCOPE
REBID - Phase 1 of this project includes abatement of the lead based paint and other hazardous materials as outlined in the environmental report, utility coordination and demolition of gas/electric/sewer/water and communication systems, demolition of 39 existing buildings and structures on site (except Bldg. #25) as shown on the demolition plans, site demolition including, but not limited to, asphalt paving/on site concrete/light pole foundations/equipment pads and sidewalk/curbs/gutters, tree and landscape salvage and other items as noted on the bid documents. Salvage and Recycling of demolished materials will be part of this project. The scope also includes creating temporary retention basins and rough grading the site to provide positive drainage away from the public right of way and to the temporary retention basins. This project has a 12% SBE goal. The Engineer's Estimate is $870K to $1.1M. For questions related to this project contact Kandi Kawolsky at (602) 534-8352 Original Bids: Breinholt Contracting - $785,960 D and K Enterprises LLC - $839,699 Norquay Construction - $863,000 Blackwell Build Group - $939,519

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT