Access the Full Project by Clicking here!
Bidjugde
JOB
Sanitary Sewer Rehabilitation - Hopkins Peralta Monterey Alameda
BID DATE
05/28/15 - 11:23
AGENCY
Berkeley
ESTIMATE
$3,254,000
SCOPE
The work to be done consists of, but is not limited to, the rehabilitation and construction by: a) Cured-In-Place-Pipe (Method ‘A’) of approximately 194 linear feet of 8-inch diameter sanitary sewer. b) Pipebursting (Method ‘B’) of approximately 8,592 linear feet of 8-inch diameter, 10-inch diameter, 12-inch diameter, 14-inch diameter, 16-inch diameter, and 24-inch diameter sanitary sewer. c) Traditional Open-trench (Method "C") of 1,016 linear feet of 6-inch diameter, 8-inch diameter, 10-inch diameter, 12-inch diameter, 14-inch diameter, and 16-inch diameter sanitary sewer. Reconstruction of approximately 4,020 linear feet of 4-inch and 6-inch diameter sanitary sewer laterals. Construction and rehabilitation of manholes including excavation and related work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT