Access the Full Project by Clicking here!
Bidjugde
JOB
Encanto Road Street Resurfacing
BID DATE
06/1/15 - 11:00
AGENCY
Menifee
ESTIMATE
$310,000
SCOPE
The work generally consists of but not limited to the following: 1. Protect existing storm drain inlets within the work area and those inlets downstream of the work area by implementing appropriate Best Management Practices. 2. Provide traffic Control. 3. Provide Public Notification and Project sign per Exhibit 2. 4. Clear and grub existing surface of any organic material and loose debris prior to crack sealing and resurfacing. 5. Remove all existing thermoplastic striping and raised pavement markers within the work area. 6. Remove and properly dispose damaged areas of AC pavement as shown in Exhibit 1 - Construction Exhibit, scarify top 12” of existing base and re-compact to 95%. Replace area with 4” min AC pavement. 7. Skin patch with 1/2” AC max. areas of severe alligator cracking. 8. Sawcut and properly remove and dispose existing concrete pedestrian ramps, curb and gutter and cross gutter were shown. 9. Install ADA compliant pedestrian ramps and replace concrete curb and gutter and cross gutters as shown in Exhibit 1 - Construction Exhibit. Contractor shall be responsible to meet all city and ADA standards and requirements. Pedestrian ramps not compliant to such standards and requirements shall be removed and replaced at no cost to the City. 10. Edge grind a 6’ wide strip of the existing pavement surface from 0.0’ to 0.1’ depth along the existing lip of gutter on both sides of the street were shown in Exhibit 1 - Construction Exhibit. 11. Prior to street resurfacing, cover all existing manholes and valves in the work area and raise to grade as needed, see exhibit 3. 12. Crack seal all traverse and longitudinal cracks 1/4” or wider over the entire work area. 13. Apply a 3/8” aggregate (chips) over a Polymer Modified Rejuvenator Emulsion (PMRE) scrub seal where shown in Exhibit 1 - Construction Exhibit. 14. Apply type II micro-surfacing over the entire work area. 15. Replace existing traffic loops. 16. Re-stripe existing road as shown in Exhibit 1 - Construction Exhibit, all striping and pavement marking shall be thermoplastic. 17. Install blue dots at the location of all existing fire hydrants.
PREBID
5/21/2015 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT