Access the Full Project by Clicking here!
Bidjugde
JOB
CC Cragin Raw Water Penstock Phase I
BID DATE
06/3/15 - 3:00
AGENCY
Payson
ESTIMATE
n/a
SCOPE
Phase 1 of the C.C. Cragin Raw Water Penstock pipe designed to provide raw water conveyance from the existing concrete tailrace connection box at the SRP generating station to Penstock Station 358+00 and includes 18 inch ductile iron piping, drain lines, combination air/vacuum release valve assemblies, valves, fittings and other appurtenances.
PREBID
5/21/2015 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT