Access the Full Project by Clicking here!
Bidjugde
JOB
Colcord Road Paving
BID DATE
06/12/15 - 11:00
AGENCY
Gila County
ESTIMATE
n/a
SCOPE
This scope pertains to the section of Colcord Road at the end of the pavement to the Gordon Canyon Bridge abutment. The work consists of extending the pavement approximately 1.2 miles beyond the point of the existing pavement to include asphalt concrete (AC) paving with two (2) thirteen foot (13 ft.) driving lanes with a total width of twenty six feet (26 ft.).
PREBID
6/1/2015 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT