Access the Full Project by Clicking here!
Bidjugde
JOB
Acacia Avenue Safe Routes to School
BID DATE
06/3/15 - 2:00
AGENCY
Sacramento
ESTIMATE
$562,588
SCOPE
The widening and installation of curb gutter and sidewalk on Acacia Avenue from Altos Avenueto Rio Linda Boulevard.The work includes regrading half of the intersection at Altos Avenue, widening existingpavement, placing new striping, placing new curbs, gutters, sidewalks, driveways placing aslurry seal, and signing and striping. Removing and replacing curb ramps with ADA complianthandicap ramps.The underground work includes installing new drain inlets and leads, and adjusting drain inletsand water valves to match new grades.The electrical work to be performed under these Special Provisions includes furnishing andinstalling all necessary equipment and material to install a new traffic signal at the intersection ofAcacia Avenue and Rio Linda Boulevard and installing street lighting as indicated on the Plansheets and these Special Provisions. Jose Ledesma - 916-808-8195 JLedesma@cityofsacramento.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT