Access the Full Project by Clicking here!
Bidjugde
JOB
Los Serranos Infrastructure Improvements Phase 2B
BID DATE
05/28/15 - 2:00
AGENCY
Chino Hills
ESTIMATE
$330,000
SCOPE
The work comprises, but is not limited to: mobilization, traffic control, sheeting shoring and bracing, construction of two (2) 36” CMP drop inlet structures per plans, two (2) catch basins per City Std 205, approximately 87 LF of 18” RCP and approximately 791 LF of 36-inch RCP storm drain pipes, 3 Manhole Structures per SSPWC Std 320-2, and grade and construct a P.C.C. energy dissipater outlet structure and construction of trapezoidal open channel at Lake Los Serranos per plans. pmontoya@chinohills.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT