Access the Full Project by Clicking here!
Bidjugde
JOB
Green Stormwater Infrastructure
BID DATE
03/25/25 - 2:00
AGENCY
Renton
ESTIMATE
$4,500,000
SCOPE
contract shall include, but not be limited to: Construction surveying, staking, and production of as-built plans, Create a SPCC plan Mobilization and demobilization Traffic control, Installing and maintaining adequate Temporary Erosion and Sediment Control measures, Protecting of existing utilities, utility potholing and resolution of utility conflicts, Protection, removal, and/ or relocation of existing site features such as mailboxes, fences, pipes, trees, etc., Sawcut, removal, and replacement of asphalt concrete pavement and cement concrete sidewalks, Trench excavation, including dewatering, shoring, removal of any existing unsuitable material, disposal of excavated material, and treatment and/ or removal of any contaminated soil and/ or water, Installing new storm system of approximately 4,459 linear feet of 4-inch, 8-inch, 12-inch and 18-inch diameter storm sewer pipe, including 55 catch basins and 1 custom rectangular structure, CCTV inspect all installed storm sewer pipe. Installing approximately 920 lineal feet of new 8-in ductile iron watermain with appurtenances, Installing of approximately 359 linear feet of water main, 8-inch ductile iron pipe with polywrap, including gate valves, fire hydrant assemblies, thrust blocking and dead man anchor blocks, Installation of approximately 5-1” water service connections and transfer of domestic services, Connection of new water system to existing water system, Installing approximately 160 linear feet of 12-inch sewer lateral Installing of approximately 40 linear feet of sewer force main, 12-inch ductile iron pipe including fittings and thrust blocking, Connection for new sewer lateral and sewer force main to existing systems, Temporary sewer bypass Installation of new 14 BioPod water quality units, including all necessary installation methods provided by the manufacture, Trench backfill with suitable material and compaction to required standards, Installing hot mix asphalt patch for utility trenches, Installing concrete curbs and gutters, driveway entrances and curb ramps, Installing pervious concrete sidewalks, Installing roadway planter strips with seeded lawn, and irrigation system, Installing hot mix asphalt roadway pavement, overlay, and speed cushion, Adjusting utility to grade, Installing permanent signing and striping, Performing landscape and property restoration. krevans@rentonwa. gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT