Access the Full Project by Clicking here!
Bidjugde
JOB
MBC Pipe Gallery Replacement
BID DATE
04/16/25 - 2:00
AGENCY
San Diego
ESTIMATE
$2,180,000
SCOPE
Construction of the MBC Pipe Gallery Replacement project involves the replacement of existing reclaimed water lines. The project consists of removing and replacing approximately 347 LF of existing 3-Inch pipe, 792 LF of existing 4-Inch pipe, 1859 LF of existing 6-Inch pipe, and 1113 LF of existing 8-Inch pipe with new epoxy-lined steel pipes within the pipe gallery, buildings 76, 70, 60 and Grit Room at the Metropolitan Biosolids Center. The project will also replace existing copper tubing with new copper tubing. The pipeline installation will include new pipe hangers, supports, butterfly valves, ball valves, and associated appurtenances. The construction also includes the replacement of two pressure reducing manifold systems in Building 70. https://vendors.planetbids.com/portal/17950/bo/bo-detail/126771#
UPDATES