Access the Full Project by Clicking here!
Bidjugde
JOB
Texian Trail Subdivision Drainage Improvements 2025
BID DATE
03/18/25 - 2:00
AGENCY
Angleton
ESTIMATE
$220,000
SCOPE
The project entails the removal of approximately 350 linear feet of existing HDPE storm sewer and the installation of a new storm sewer system, comprising 40 linear feet of 24-inch RCP, 270 linear feet of 30-inch RCP, and 200 linear feet of 36-inch reinforced concrete pipe. Additionally, 35 cubic yards of grout will be used to fill a portion of the existing 30-inch HDPE. The scope includes the installation of manholes, connecting the new storm sewer to existing inlets, performing a full-depth concrete paving point repair over 160 square yards, and removing and replacing the outfall according to Angleton Drainage District specifications. The work also involves reconstructing curbs and sidewalks within the project limits. https://www.civcastusa.com/project/67b4b93f72bc8a66c4fe6895/summary Ryan.Nokelby@hdrinc.com
PREBID
3/11/2025 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT