Access the Full Project by Clicking here!
Bidjugde
JOB
Sweetwater Dwsrf Water Syst Imp Contract B Raw Water Booster Pump Station Rehabilitation
BID DATE
04/10/25 - 3:00
AGENCY
Sweetwater
ESTIMATE
$800,000
SCOPE
Demolition of old pump motors, equipment, piping, and electrical components at the Oak Creek pump station, Booster B pump station, and Booster A pump station. Installation of new pump motors, VFD’s, HVAC units, electrical components, instrumentation, and pipe fittings as shown on plans. The existing surge check valves at each Booster pump station are to be inspected and repaired as necessary. The existing surge check valve at the Oak Creek pump station shall be replaced. https://www.civcastusa.com/project/67c063d1b743b5875028b12f/summary leroy.arce@e-ht.com
UPDATES