Access the Full Project by Clicking here!
Bidjugde
JOB
16th Ave Tulare Lake Canal Bridge Replacement
BID DATE
03/27/25 - 4:00
AGENCY
Kings County
ESTIMATE
n/a
SCOPE
Remove existing five span timber stringer bridge with a timber deck. Replace existing bridge with cell reinforced concrete box culvert. Install Type 836 concrete barriers with tubular bicycle railing. Construction to take place in September 2025 when flowing water is not anticipated in the channel. Patricio.Villegas@co.kings.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT