Access the Full Project by Clicking here!
Bidjugde
JOB
Wilson Way Undercrossing Pump Station Reconstruction
BID DATE
03/20/25 - 2:00
AGENCY
Stockton
ESTIMATE
n/a
SCOPE
The work includes all labor, materials, and equipment required to replace the existing mechanical float switches, add pressure transducer; remove the temporary pump control panel after the new system has been installed and is operational; replace existing SCADA panel and make all control and pump connections, program HMI and PLC for City's SCADA technicians to interconnect with the new controllers; furnish & install a new MCC and replace all MCC components; furnish & install cable and strain reliefs to support cable drops to pumps at the bottom of sump. https://www.stocktonca.gov/bid_detail_T22_R888.php kelly.ju@stocktonca.gov marianne.dominguez@stocktonca.gov
PREBID
3/6/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT