Golden Ave Storm Drain Improvements
BID DATE
02/25/25 - 10:00
AGENCY
Lemon Grove
ESTIMATE
n/a
SCOPE
The project consists of abandoning in place by slurry filling approximately 150 LF of 18” HDPE pipe, installing 130 LF of dual 18” HDPE storm drain, CIPP lining of approximately 150 LF of 24” CMP. The work also includes construction of headwalls, catch basins, clean outs, trenching, surface repair and miscellaneous other items associated with storm drain installation. The new pipe installation is predominately in an AC parking lot; the CIPP is predominately within an easement on private property. https://vendors.planetbids.com/portal/33470/bo/bo-detail/125981 ewalton@lemongrove.ca.gov