JOB
Elmendorf Lake Dam Improvements
BID DATE
03/7/25 - 2:00
AGENCY
San Antonio
ESTIMATE
$1,500,000
SCOPE
The project will repair the leaking vertical expansion joints present at the Elmendorf Lake Dam and will remove sediment material from the upstream side of the labyrinth weir structure by installing a phased cofferdam configuration and dewatering a portion of the lake. A bid Alternate for the project will additionally remove 6 butterfly valves from the outfall structures of the dam and replace them with 6 knife gate valves. https://www.civcastusa.com/project/67ab668f89e251b27dd44539/summary Peter.DuroJR@sanantonio.gov
PREBID
2/19/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT