Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Paving Drainage Improvements Mayo Blvd Miller Rd Alignment
BID DATE
07/24/25 - 11:00
AGENCY
Scottsdale
ESTIMATE
n/a
SCOPE
The Project is approximately 14 acres located on Mayo Boulevard between 73rd Place and the Miller Road alignment. The construction of this project will involve the use of public funds, and therefore, Title 34 of the Arizona Revised Statutes will be applicable. Generally, this Paving and Drainage project will require cost estimating, value engineering, constructability review, and construction of a portion of the paving and drainage work including but not limited to approximately 14,100 square yards of arterial roadway pavement, 3,200 linear feet of vertical curb and gutter, 1,300 linear feet of 10-foot wide multi-use path, driveways, sidewalk curb ramps, 5,200 linear feet of HDPE storm drain pipe, headwalls, rip-rap inlet/outlet protection, site grading, surveying, and testing. Substantial completion of the project is anticipated on or before September 15, 2025 MayoMillerPlans@kimley-horn.com https://scottsdaleaz.bonfirehub.com/opportunities/173874
UPDATES