Access the Full Project by Clicking here!
Bidjugde
JOB
2015 Street Seal Coat Project and 65th Street Bike Lane
BID DATE
05/27/15 - 2:00
AGENCY
Sacramento
ESTIMATE
$1,796,000
SCOPE
The work to be performed under these Special Provisions consists of resurfacing (slurry seals,microsurfacing, and chip seals) various residential, collector, arterial streets, and bike paths (seeAppendix A and B) within the City of Sacramento. This work shall consist of mixing asphalticemulsion, aggregate, set-control additives, water, and spreading the mixture on properly preparedsurfacing and any other work involved in constructing or placing material. This work shall alsoinclude the removal and placement of traffic striping, markings, signs, and raised pavementmarkers. Selected manholes and water valves shall be raised to the new grade. Pavementgrinding at selected curb ramps will be included to meet ADA requirements. The work alsoincludes removal and replacement of curb ramps and removal and reconstruction of curb andgutter and concrete median on 65th Street. Jose Ledesma - 916-808-8195 JLedesma@cityofsacramento.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT