Access the Full Project by Clicking here!
Bidjugde
JOB
Robert B Diemer Water Treatment Plant East Basin Rehabilitation
BID DATE
06/2/15 - 2:00
AGENCY
MWD
ESTIMATE
$26,000,000
SCOPE
The work consists of removing, furnishing and installing flocculation/sedimentation basin equipment including gates and valves, flocculator motors/variable frequency drives, gear reducers, drive trains, shafting/arms/couplings, bearing housing and liner, paddle wheel boards, baffle wall boards and supports, clarifier motor/integral gearboxes, worm gearboxes and pinions, rakes and launders; removing, furnishing (or refurbishing) and installing clarifier turntable assemblies; removing, refurbishing and re-installing clarifier access bridges; replacing or modifying structural support components of equipment; furnishing and installing basin inlet channel isolation drop gates; disposing replaced equipment; removing and disposing Polychlorinated Biphenyls (PCBs)-containing sealants and concrete; furnishing and installing launder isolation gates; installing Metropolitan-furnished sludge pumps and modifying associated sludge piping; repairing spalled concrete; removing, furnishing and installing access hatches, handrails, and lights; removing, furnishing/installing or modifying electrical and control components; and performing all appurtenant work. SpecsDesk@mwdh2o.com
PREBID
5/5/2015 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT