Wildwood Drive Pump Station Gravity Sewer Force Main
BID DATE
03/18/25 - 11:00
AGENCY
Social Circle
ESTIMATE
n/a
SCOPE
The project consists of: Division 1: Approximately 6,100 L.F. of 8-inch PVC and ductile iron sewer, with 25 precast concrete manholes, 170 L.F. of jack-and-bore using 16-inch casing, approximately 2,650 L.F. of 6-inch PVC and ductile iron forcemain, with one air release valve and manhole, and all appurtenances. Time allotted for this work is 270 days. Division 2: Construction of the Wildwood Drive Pump Station and access road and demolition and abandonment of the Edmundson Pump Station and Railroad Pump Station. The work to be performed by the General Contractor consists of but is not limited to the following major items: 1. 6,100 L.F. of 8-inch PVC and Ductile Iron Sewer 2. 25 Precast Concrete Manholes 3. 170 L.F. 16 inch casing and Jack and Bore 4. 2,650 L.F. of 6-inch PVC and Ductile Iron Forcemain 5. Construction of the Wildwood Pump Station 6. Access road 7. Abandonment of the Edmundson Pump Station 8. Abandonment of the Railroad Pump Station 9. Erosion Control Best Management Practices 10. https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-66276-NONST-2025-000000014&sourceSystemType=gpr20 rgroves@socialcirclega.gov
UPDATES