Access the Full Project by Clicking here!
Bidjugde
JOB
Hodgeville Sanitary Sewer Force Main Construction
BID DATE
03/13/25 - 2:00
AGENCY
Effingham County
ESTIMATE
n/a
SCOPE
The Scope includes supply and installation of piping/connections to/from the County¿s Wastewater Treatment Plant and the existing Hodgeville Pump Station This section outlines the scope of the installation of an 18-inch Fusible Polyvinylchloride (FPVC) force main to improve wastewater infrastructure. The project includes site preparation, clearing, excavation, trenching, horizontal directional drilling (HDD), jack-and-bore crossings, utility connections, and final site restoration. Contractors must implement erosion control, traffic management, and public safety measures while maintaining continuous service for existing utilities. Strict compliance with Kinder Morgan gas line crossing permits, environmental regulations, and project specifications is required. Deliverables include as-built drawings, pressure test reports, and final project documentation. https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-65100-NONST-2025-000000025&sourceSystemType=gpr20 lshuman@effinghamcounty.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT