Access the Full Project by Clicking here!
Bidjugde
JOB
Max Lockwood Dr Roadway Improvements
BID DATE
04/4/25 - 3:00
AGENCY
Statesboro
ESTIMATE
n/a
SCOPE
This work will include reconfiguring the road to a one-way thoroughfare, installing traffic calming measures, ensuring all private drives along the roadway conform to standard commercial driveways, and installing of a new storm pipe network to improve drainage. Additionally, the project requires adding an entrance from Fair Road to the Statesboro/Bulloch County Parks and Recreation parking lot adjacent to SR 67/Fair Road. Work will include but is not limited to the following: clearing, excavating, setting grade, installing subgrade materials, paving, concrete forming, concrete pouring, concrete pipe installation, grading and dressing of job site, and traffic striping. https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-61650-NONST-2025-000000037&sourceSystemType=gpr20 darren.prather@statesboroga.gov
UPDATES