Access the Full Project by Clicking here!
Bidjugde
JOB
Water Main Replacement Rutgers Wintergreen Arcady Dallas Avenue Stanford
BID DATE
03/18/25 - 2:00
AGENCY
Lancaster
ESTIMATE
n/a
SCOPE
Scope of Work: 1. Rutgers Drive from Wintergreen Road to Arcady Lane a. Replace roughly 489 linear feet of water main from a 6” cast iron pipe to an 8” PVC pipe. b. On Wintergreen Road water main, installation of 12” X 12” X 8” Tee with 2 valves with valve pads if in grass. One being installed on the water main on Rutgers Drive and the other on the water main on Wintergreen Road. c. On Arcady Lane water main, installation of 8” X 8” X 8” Tee with 2 valves with valve pads if in grass. One valve on Rutgers Drive and the other on the water main on Arcady Lane. d. Installation or replacement of the 12 water services from water main to the water meter. e. Install 12 new water meter boxes with fittings. f. Testing and chlorinating water main before putting it in service. g. Replace or install 2 fire hydrants with valves. Valve boxes needed if in grass. One hydrant to be installed on Wintergreen Road and Rutgers Drive. The other on Rutgers Drive and Arcady Lane. h. The installation of a bypass water main to feed services while the construction is going on. This line is to be chlorinated and tested before in use. i. Asphalt repair on public paving roughly 40 feet. j. Traffic control. 2. Rutgers Drive from Stanford Drive to Dallas Avenue. Page 2 of 5 a. Replace roughly 1276 linear feet of water main from an 8” cast iron pipe to an 8” PVC pipe. b. On Dallas Avenue water main, installation of 8” X 8” X 8” Tee with 2 valves with valve pads if in grass. c. Stanford Drive water main, installation of 8” X 8” X 8” Tee with 2 valves with valve pads if in grass. d. Asphalt repair on public paving roughly 40 feet. e. Installation or replacement of 4 fire hydrants with valves and valve boxes if in grass. f. Install or replace 41 services from water main to water meters. g. Replace 41 meter boxes with fittings. h. Testing and chlorinating water main before putting it in service. i. The installation of a bypass water main to feed services while the construction is going on. This line is to be chlorinated and tested before in use. j. Traffic control plan. https://ltxebid.ionwave.net/PublicDetail.aspx?bidID=800&SourceType=1 cwomble@lancaster-tx.com
UPDATES