Access the Full Project by Clicking here!
Bidjugde
JOB
Murdock Street Sidewalk Storm Improvements SRTS Templeton Twality Improvements
BID DATE
03/4/25 - 2:00
AGENCY
Tigard
ESTIMATE
$4,250,000
SCOPE
Invitation to Bid No. 2025-15 The project generally consists of the following: 1. Traffic control, erosion and sediment control. 2. General Excavation. 3. Construction of asphaltic pavements. 4. Construction of concrete curbs, ramps, driveways and sidewalks. 5. Installation of storm drainage pipe, structures and facilities. 6. Installation of water pipe, services, and meters. 7. Installation of retaining walls. 8. Installation of rapid flashing beacon, striping, pavement markings, and signs. 9. Installation of lighting poles and arms, switching, conduit, wiring, luminaires, lamps, and ballasts. 10. Landscaping and irrigation. 11. Performance of additional and incidental work as call for by the specifications and plans. https://www.tigard-or.gov/Home/Components/RFP/RFP/180/199 contractspurchasing@tigard-or.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT