Tyler Street Overlay
BID DATE
03/6/25 - 3:00
AGENCY
Port Townsend
ESTIMATE
n/a
SCOPE
The Tyler Street Overlay project includes the following work: full-depth-reclamation (FDR) of travel lanes, add cement treatment to the travel lanes FDR, and pave the travel lanes FDR with HMA asphalt; reshape the FDR of the shoulders and pave the shoulders with HMA asphalt; remove existing sidewalk, curb ramps, and curbs; construct curb ramps and sidewalk, and furnish and install detectable warning strips; and furnish and install pavement markings. The work will also include traffic control, temporary pedestrian route maintenance, and coordination with the City for construction sequencing. lparsons@cityofpt.us