Access the Full Project by Clicking here!
Bidjugde
JOB
Widening Right Turn Deceleration Lane Along NB FM 523 EB CR 792
BID DATE
03/21/25 - 11:00
AGENCY
Brazoria County
ESTIMATE
n/a
SCOPE
The proposed work consists of prep ROW, excavation, embankment, asphalt pavement widening, concrete pipe culverts, pipe safety end treatment, driveways, signing and pavement markings, and SWP3 devices. Grade ditch to drain. Traffic control standards and signage is included in the plans, minimize interruption of work to traffic. https://brazoriacounty.bonfirehub.com/opportunities/173055
PREBID
2/20/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT