Access the Full Project by Clicking here!
Bidjugde
JOB
State Street Water Improvements
BID DATE
03/25/25 - 11:00
AGENCY
Eastern Municipal WD
ESTIMATE
$5,000,000
SCOPE
"The work comprises construction of approximately 3,000 linear feet of 20-inch CML&C water pipeline in Stetson Avenue and State Street. Work shall also include the reconnection of existing laterals, fire hydrants, and water services. The work will also include the abandonment of approximately 3000 linear feet of the existing 20-inch CML&C pipeline. Work shall include all restrained joints, thrust blocks, valves, blowoffs, air valves, shoring and bracing per California Labor Codes, excavation, backfill, bedding, pavement removal, provisional pavement replacement and final pavement restoration including but not limited to grinding and overlaying AC pavement (.1’ min.), material removal, hauling and disposal, tack coat, Hot Mixed Asphalt, placing, compaction, raised pavement markers, striping, traffic loops replacement, valve cans and manhole lids leveling, cleaning all work per Appendix H (Pavement Restoration Exhibit), City of Hemet encroachment permit, trench and pipeline dewatering, pipeline pressure testing, pipeline disinfection, traffic control, SWPPP, and other related appurtenant work. All work shall be in accordance with these specifications and contract drawings. https://vendors.planetbids.com/portal/25577/bo/bo-detail/125890 morgensj@emwd.org "
UPDATES