Access the Full Project by Clicking here!
Bidjugde
JOB
Walker Calloway Branch Outfall Trunk Sewer System Phase 4 Improvements
BID DATE
03/20/25 - 2:00
AGENCY
Trinity River Authority
ESTIMATE
n/a
SCOPE
The project scope includes, but is not limited to, the following major work items: Cured-In-Place-Pipe (CIPP) lining of approximately 1,914 linear feet of existing 27?inch reinforced concrete gravity sewer pipe. Open-Cut replacement of approximately 1,069 linear feet of 27-inch gravity sewer pipe. Open-Cut installation of 24 linear feet of 15-inch PVC gravity sewer pipe and 48 linear feet of 8-inch PVC gravity sewer pipe. Replacement of existing meter station; Installation of ten (10) new manholes along the trunk sewers; Abandonment of approximately 937 linear feet of existing 27-inch reinforced concrete gravity sewer pipe; Removal and replacement or rehabilitation of ten (10) 60-inch diameter manholes along the trunk sewers; https://www.civcastusa.com/project/67a5330739e5966532d83aa0/summary vossaf@trinityra.org
UPDATES