Access the Full Project by Clicking here!
Bidjugde
JOB
Baker Dr Cherry Street Sidewalk Improvement
BID DATE
02/20/25 - 2:00
AGENCY
Tomball
ESTIMATE
$147,750
SCOPE
Furnish all necessary materials, machinery, equipment, superintendence and labor for the installation/construction of the following: This project consists of three sites with one portion spanning a little over two (3) City blocks. Each portion will start with the site clearing and grubbing of the area for placement of a new sidewalk, removal and demo of existing curb, some sidewalk, concrete and asphalt drives not to exceed the area shown on the plans without prior approval from the City and Engineer of Record. Some areas will require removal of asphalt along with the curb. The project will start at the intersection of Baker Dr. and Inwood St. preparing side for addition of sidewalk and ADA ramps on the West side of the intersection. Sodding will be installed to replace the removal of the existing sidewalk and must match existing grass. Please refer to sheet 13 for the project site. The next portion of the project will start on the East side of the intersection of Baker Dr. and Hicks St. and approximately twenty-one (21) feet North. This portion will consist of preparing the site from this location all the way South to Main St. placing 5’ wide concrete sidewalk up against the curb and extending out towards the East to cross drives following City of Tomball Standards and Details. Small trees, mailboxes, and a fence will be relocated to the East per City and owner’s request. Street signs will be relocated per City request. New drive approaches through the sidewalks will be constructed with this project and the property at 103 Baker Dr. will require a new two-entrance/exit drive completed as shown on the plans. Sodding shall be installed after removal of the fence to match existing grass. Vaults must be adjusted to match proposed elevations. Please refer to sheets 9-12 for the project site. The last part of this project will require the site preparation along the West side of Cherry St. connecting existing sidewalks on both ends. From Market St. to the first drive entrance to the South. The site will require construction of a small stem six (6) inch retaining stem wall with a half portion of concrete slope protection in the channel. The other half will remain vegetated. Relocation of a street sign. Hydro mulch seeding after regrading on existing channel. Please refer to sheet 14 for the project site. https://www.civcastusa.com/project/67a618b81a14b23a549e6cca/summary adam.valenzuela@oei-eng.com
PREBID
2/13/2025 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT