2023 Cdbg Sanitary Sewer Rehabilitation
BID DATE
02/19/25 - 10:00
AGENCY
Silsbee
ESTIMATE
n/a
SCOPE
. Mobilization; .Rehabilitate approximately 1,309 LF of existing 8" sanitary sewer line with a 8.625" O.D. (7.55" I.D.) DR 17 HDPE liner pipe by the pipe-bursting method of construction; .Remove and replace 4 existing sanitary sewer manholes outside of pavement with new fiberglass manhole; .Construct 1 new fiberglass sanitary sewer manholes outside of pavement; .Remove and replace 2 existing sanitary sewer main line cleanouts with shallow fiberglass manhole; .Seal 3 manhole or cleanout lids with silicone gasket maker and inflow prevention devices; .Restore approximately 64 sanitary sewer services on rehabilitated lines; .Remove and replace 1 existing sanitary sewer lift station with new “packaged” lift station. .Directional drill 738 LF of 4” HDPE to replace the existing force main, including tie in with proposed force main from proposed lift station; .Bore and jack 200 LF or 4” HDPE and 8” steel casing in accordance with railroad and permit and TXDOT permit requirements .Directional drill 785 LF of 4” HDPE to replace the existing force main, including tie in with existing manhole https://www.civcastusa.com/project/679b9c388115f3cd6660bfd9/summary zrowe@leadllc.com
PREBID
2/12/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT