Access the Full Project by Clicking here!
Bidjugde
JOB
FDOT A1A Utility Relocations Phase 2
BID DATE
04/21/25 - 3:00
AGENCY
Hollywood
ESTIMATE
n/a
SCOPE
Construction services for several utility relocations for water, sewer, and reuse mains associated with future FDOT construction projects along FDOT's A1A corridor within the city of Hollywood. The following locations are to be considered; (1) Franklin Street to Desoto Street –Approximately 1,000 linear feet of utility relocation (water, sewer, and reuse mains ranging in diameter). Work includes excavation, associated valves installation, curbs, sidewalk removal and replacement, backfill, asphalt and driveway repairs and other work as required in the Contract Documents. https://procurement.opengov.com/portal/hollywoodfl/projects/153051 hdavalos@hollywoodfl.org
UPDATES