Access the Full Project by Clicking here!
Bidjugde
JOB
Ron Sapp Egans Creek Greenway Beech St Bridge Redecking
BID DATE
02/27/25 - 2:00
AGENCY
Fernandina Beach
ESTIMATE
$200,000
SCOPE
"The Beech Street right-of-way bridge is a large timber structure that crosses Egans Creek at the Greenway, beginning about one block east of Citrona Drive and ending west of the Atlantic Recreation Center located at 2500 Atlantic Ave. The Beech Street bridge (EW 2 Beech Street) is approximately 200 feet long, 16-feet wide, is constructed of heavy timber framing and decking and is supported by round timber piles. The decking system is experiencing degradation and warranting replacement. https://www.fbfl.us/bids.aspx?bidID=353"

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT