Access the Full Project by Clicking here!
Bidjugde
JOB
MLK Cedar St Water Main Replacement Elm St Pine St Gravity Sewer
BID DATE
03/11/25 - 2:00
AGENCY
Safety Harbor
ESTIMATE
$4,300,000
SCOPE
PROJECT A: MLK, Cedar St. Water • Installation of the water main by open-cut method • Installation of new water service laterals from the new water main to the proposed water meters with a new meter box in the orientation as shown on the drawings • Pressure testing, disinfection, and bacteriological testing of the water main • Coordinate with the City to obtain FDEP clearance for the new water main • Connecting existing water main(s) and service piping to the new water main(s) • Restoration of private property including landscape, driveways and other miscellaneous restoration PROJECT B: Elm St., Pine St. Gravity Sewer • Installation of the sanitary sewer main by open-cut method • Installation of new sewer laterals from the new sewer main to the proposed cleanout location as shown on the drawings • Pressure testing of the new sanitary sewer mains • Coordinate with the City to obtain FDEP clearance for the new sanitary sewer main • Restoration of private property including landscape, driveways and other miscellaneous restoration • Restoration Right-of-Ways to existing conditions or better, including concrete curbs, granite curbs, sidewalks, driveway aprons, milling and resurfacing of asphalt and miscellaneous site restoration. cahrens@cityofsafetyharbor.com
UPDATES