Twin Lakes Dam Rehabilitation
BID DATE
03/5/25 - 3:00
AGENCY
Cary
ESTIMATE
n/a
SCOPE
The project consists of draining two existing ponds, breaching the earthen embankments, installing temporary bypass pipes and diversion channels; constructing new concreter riser and box outlet structures, low flow drain, trash racks, and outlet protection; backfilling and raising the existing earthen embankments up to 3 feet; restoring approximately 280 feet of stream; installing a 370 feet regenerative stormwater conveyance outfall channel; grading and paving approximately 2,800 feet of greenway and associated appurtenances. https://townofcary.geocivix.com/secure/project/?projectid=1602294 paul.kuhn@townofcary.org