Access the Full Project by Clicking here!
Bidjugde
JOB
G Street Sanitary Sewer Improvement 5th Street 7th Street Phase 1
BID DATE
02/20/25 - 3:00
AGENCY
Clearfield
ESTIMATE
n/a
SCOPE
The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above project, consisting of the following items of work: mobilization, obtaining all bonds and insurance including railroad insurance as required, remove and replace of fire hydrants, concrete, asphalt, and other finish amenities, furnish and installation of approximately 625 lf. of 12"" PVC SDR 35 sanitary sewer pipe with approximately 60 lf. of jack and bored 24"" steel sleeve under Union Pacific Railroad crossing. Includes reconnection of all existing sanitary sewer laterals, removal of existing manholes, placement of new manholes, and all appurtenant work in accordance with the Drawings and Specifications prepared by the Engineer, CEC, Civil Engineering Consultants, PLLC. https://utah.bonfirehub.com/opportunities/171677

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT