2023 2024 Arterial Minor Streets Maintenance Phase 3
BID DATE
03/6/25 - 2:00
AGENCY
Riverside
ESTIMATE
$6,838,279
SCOPE
The project generally includes but is not limited to cold milling of existing deteriorated asphalt pavement, the application of ARAM; resurfacing asphalt pavement with DGAC; slurry sealing streets, repairing damaged concrete sidewalks, driveways, pedestrian ramps, curb/gutters, and cross gutters; with the replacement of traffic striping; and signage enhancements. This project also includes City of Riverside downtown parking lot slurry preservation and installation of parking safety lighting at 3 locations. https://vendors.planetbids.com/portal/39475/bo/bo-detail/126134 jajones@riversideca.gov