Access the Full Project by Clicking here!
Bidjugde
JOB
Beach Cities Green Streets S 194
BID DATE
02/19/25 - 3:00
AGENCY
Torrance
ESTIMATE
$7,900,000
SCOPE
The Work generally consists of the installation of green infrastructure BMPs in Hermosa Beach, Manhattan Beach, Redondo Beach, and Torrance (the Beach Cities). More specifically, the work includes installing pervious concrete pavement, replacing catch basins, planting trees, and installing drywells at designated streets as shown on the plans in the Beach Cities to intercept, filter, and retain dry- and wet-weather runoff. https://vendors.planetbids.com/portal/47426/bo/bo-detail/125454 WMendoza@TorranceCA.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT