Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2024 25 Annual Minor Streets Rehabilitation Program
BID DATE
03/5/25 - 3:00
AGENCY
Simi Valley
ESTIMATE
n/a
SCOPE
"Work consist of: 1) 30,063 S.F. of 1-1/2” asphalt pavement cold milling; 2) 300 tons of asphalt rubber hot mix overlay placement; 3) 205,517 S.F. of 2” asphalt pavement cold milling; 4) 2,700 tons of conventional asphalt overlay placement; 5) 345 L.F. of BPCONSTR July 2024 5 SV-25-03 Specification No. SV 25-03 asphalt dikes placement; 6) 243 S.F. of removal and reconstruction of asphalt sidewalk; 7) 588 S.F. of sawcut, removal, and reconstruction of concrete sidewalk; 8) 101 L.F. of concrete sidewalk grinding; 9) 9 sawcut, removal, and reconstruction of curb ramps; 10) 1 sawcut, removal and installation of cast-in-place truncated dome; 11) 2 sawcut, removal, and reconstruction of parkway drains; 12) 1,323 S.F. of sawcut, removal, and reconstruction of commercial concrete driveway approach; 13) 656 S.F. of sawcut, removal, and reconstruction of cross gutter and spandrel; 14) tree evaluation and recommendation report by licensed arborist; 15) 30 L.F. of root pruning; 16) 30 L.F. of root barrier installation; 17) 1 tree removal; 18) 18 sewer manhole frames and covers replacement; 19) 51 water valve covers and concrete rings replacement; 20) 3 survey monument adjustments to grade; 21) 6 water meter box adjustments; 22) 1 storm drain manhole adjustment; 23) various traffic signing and pavement delineation; and 24) all appurtenant work. https://www.simivalley.org/Home/Components/RFP/RFP/259/169 aagoncillo@simivalley.org "
PREBID
2/19/2025 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT