MacArthur Drive 24-inch Water Line
BID DATE
05/5/15 - 2:00
AGENCY
Tracy
ESTIMATE
n/a
SCOPE
The Project is more specifically defined in the plans and specifications, but generally includes the following work to be done: The installation of approximately 6500 LF of 24” DIP water main and connecting it to existing water mains on both ends of the new line, including the removal of pavement, trench excavation, placement of new fittings, couplings, reducers, coating, restrained joints, paving, and other related work as required for the installation of the new water main. Khoder Baydoun, Associate Civil Engineer khoder.baydoun@ci.tracy.ca.us Telephone: (209) 831-6453 Fax: (209) 831-4430