Access the Full Project by Clicking here!
Bidjugde
JOB
10th Street Retaining Wall Reconstruction
BID DATE
02/20/25 - 12:00
AGENCY
Park City
ESTIMATE
n/a
SCOPE
The work includes the removal of the existing stairway that has bowed, all the work involved with shoring the cut that was stabilized by the failing stacked rock wall (including removal of asphalt and curb sections of 10th Street), removal of the stack rock wall and the wood guardrail, installation of new reinforced concrete wall and foundation drain line, connection of said foundation drain line to the existing storm drain line in 10th Street, installation of guardrail, and rebuilding the stairway. Minor site preparation/earthwork and landscape restoration may be required. https://utah.bonfirehub.com/opportunities/169561 steven.dennis@parkcity.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT