Edding Drive Storm Drain Improvements
BID DATE
02/6/25 - 1:30
AGENCY
Lemon Grove
ESTIMATE
n/a
SCOPE
The project consists of replacing approximately 300 lineal feet of 18” & 24” diameter CMP with 18” and 24” diameter HDPE storm drain pipe. The pipe replacement is predominately within an easement on private property with limited access. The work includes protection of existing structures, installation of storm drain pipe man holes, and catch basins, restoration of surface improvements including concrete driveways, wood fences, retaining walls, street trenching and repair and tree removal/replacement. Izzy Murguia 619-825-3814 imurguia@lemongrove.ca.gov