Springs Preserve Cienega Modifications Phase II
BID DATE
02/6/25 - 11:00
AGENCY
Las Vegas VWD
ESTIMATE
$3,980,400
SCOPE
The Work consists of construction of flood control improvements within the existing Meadows Detention Basin. Improvements include construction of a concrete lined open channel connecting the existing upstream inflow structure with the existing downstream outflow structure, replacement of the existing ogee crest overflow spillway with a higher capacity labyrinth spillway, and other miscellaneous associated flood control appurtenances. Removals necessary to construct the improvements include removal of existing riprap, portions of existing concrete drainage structures, existing concrete spillway crest, and existing outlet trash rack grate. Purchasing.HelpDesk@lvvwd.com