Citywide CMP Lining & Rehabilitation Program
BID DATE
05/6/15 - 10:00
AGENCY
Santee
ESTIMATE
$2,100,000
SCOPE
Work To Be Done includes the lining of existing corrugated metal pipe (CMP) storm drains with the cast in place pipe (CIPP) trenchless lining process including but not limited to; cleaning storm drain pipes and structures, the removal of silt and debris within existing storm drain pipes, grouting voids in existing storm drain pipes, installation of storm drain cleanouts, inlets, and headwalls, repairs to existing storm drain structures, replacement of CMP storm drain, installation of RCP storm drain, installation of rip rap, tree removal, clearing and grubbing and all related and necessary work as defined in the contract documents. Brian Banzuelo at (619) 258-4100 ext. 165, or via email at bbanzuelo@ci.santee.ca.us.