Access the Full Project by Clicking here!
Bidjugde
JOB
Fresno Paving Drainage Improvements
BID DATE
02/25/25 - 2:00
AGENCY
Fort Bend County
ESTIMATE
n/a
SCOPE
"The scope of work requires removal of existing concrete pavement and subgrade material and removal of existing asphalt patchwork, and removal of existing asphalt tie-in to shared access road. New parking lot concrete will be 7-inch reinforced concrete with 8-inch cement stabilized subgrade. New asphalt tie-in to shared access road will be 2-inch HMAC asphalt, 8-inch HMA base course (black base), and 6-inch cement stabilized subgrade. New drainage improvements will include 12-inch HDPE, 15-inch HDPE, and 24-inch RCP storm sewers connected by 4 new Type A grate inlets. Regrading of the existing swale along the south side of the existing shared access road, in addition to, regrading of an existing grassed swale from the southwest corner of the parking lot to the FM 521 roadside ditch is also required. Parking lot improvements will include parking space striping, handicap parking space markings, new handicap ramp, installation of handicap railing, and new handicap parking signs. Storm Water Pollution Prevention is also included as part of the scope of this project. https://www.fortbendcountytx.gov/b25-029-construction-fort-bend-county-annex-fresno-paving-and-drainage-improvements-fort-bend-county Melissa.Stavinoha@fortbendcountytx.gov "
UPDATES