Access the Full Project by Clicking here!
Bidjugde
JOB
Well Completion Transmission Main
BID DATE
02/26/25 - 3:00
AGENCY
Bullhead
ESTIMATE
n/a
SCOPE
The Contractor will set the well pump, column piping, vertical shaft, discharge head, vertical 500 horsepower hollow shaft motor, and related above ground 16” piping and accessories including a new flow meter with Supervisory Control and Data Acquisition connection. The Contractor will trench and install the 16” underground piping on the well site per plans and specifications. The Contractor shall trench and install all electrical conduit and wiring underground per electrical drawings and specifications. nbogenschild@bullheadcityaz.gov https://www.bullheadcity.com/Home/Components/RFP/RFP/288/462
PREBID
1/27/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT