S H 276 Utility Relocations
BID DATE
02/6/25 - 2:00
AGENCY
Rockwall
ESTIMATE
n/a
SCOPE
S.H. 276 Utility Relocations As set forth in the plans and specifications, the project is designed to complete the following approximate quantities of work: .2,200 Linear Feet (LF) of 16-inch PVC Water Line by Open Cut .100 LF of 24-inch PVC Water Line by Bore w/ 36-inch Steel Encasement .Thirteen (13) 16-inch Butterfly Valves .2,200 LF of 10-inch PVC Force Main by Open Cut .2,200 LF of 6-inch PVC Force Main by Open Cut .1,300 LF of 8-inch PVC Sanitary Sewer by Open Cut .120 LF of 8-inch PVC Sanitary Sewer by Bore w/ 16-inch Steel Encasement .130 LF of 10-inch PVC Sanitary Sewer by Bore w/ 16-inch Steel Encasement .Nine (9) 4-foot or 5-foot diameter sanitary sewer manholes https://www.civcastusa.com/project/678abb5dca86bc40468bca89/summary dchaney@bhcllp.com