Access the Full Project by Clicking here!
Bidjugde
JOB
2015 Storm Drain Repair
BID DATE
04/27/15 - 2:00
AGENCY
Redlands
ESTIMATE
$36,000
SCOPE
The scope of the project consists removal of existing 12" CMP and installation of 12" CML&C including two cleanouts, repairing curb & gutter, replacement of thermo striping, trench backfill and repair per specifications and 0.1 AC overly to the limit shown on the plan. Goutam Dobey City of Redlands PO Box 3005 35 Cajon St Suite 15A Redlands, CA 923731505 Tel:(909) 798-7584 x2 Fax:(909) 798-7670 gdobey@cityofredlands.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT