23 03921 Texas A M University Area Streets
BID DATE
02/7/25 - 2:00
AGENCY
San Antonio
ESTIMATE
$6,508,106
SCOPE
Construct roadway improvements to include sidewalks, driveway approaches, drainage, and other improvements as applicable and within available funding. This project includes phased improvements to Perimeter Loop Road to consist of construction of 4,700 ft of new roadway with two 12.5-ft travel lanes (one lane in each direction), curb and gutter, drainage infrastructure and a 11-ft shared use path. https://www.civcastusa.com/project/6737bddba6c6d95fdc8ad44b/summary