North Interceptor Wastewater Improvements Phase 1C
BID DATE
03/13/25 - 2:00
AGENCY
Waco
ESTIMATE
n/a
SCOPE
The project generally consist of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place approximately 8,870 linear feet of 30-inch Hobas ASTM D3262 gravity wastewater line, 26 new manholes of various size and material, approximately 365 linear feet of bore and encased line using 48-inch steel casing pipe, temporary by-pass system, abandonment existing force mains and wastewater lines, approximately 1,950 linear feet of 6- inch water line, surface replacement, road repair and all necessary components as shown on the project drawings and as specified herein. Melanie Wade, melaniew@wacotx.gov https://waco-texas.bonfirehub.com/opportunities/166937#!#opportunityMessagesSection