Access the Full Project by Clicking here!
Bidjugde
JOB
Camino Del Sol Water Sewer Street Improvements Phase 2
BID DATE
02/21/25 - 3:00
AGENCY
Nogales
ESTIMATE
n/a
SCOPE
Replacement of an existing 4” asbestos cement water main and 6” sanitary sewer main constructed in 1922. The approximate total length of the proposed new water main 8” PVC is 1,905 feet. In a similar manner, the approximate total length of 8” sanitary sewer main is 2,155. The number of new polyline water services is 42 and the number of new 4” PVC house sewer connection is 51. The project also include the replacement of the existing sanitary sewer main. The pavement will be reconstructed in Camino Del Sol, Marina Street and Ellis Street. The estimated pavement replacement area to be done by the contractor is 43,218 SF (4,802 SY). The estimated pavement replacement area to be done by City crews is 35,054 SF (3,784 SY). The proposed pavement cross section is 3” Asphalt Concrete over 4” Aggregate Base Course. jkramer@nogalesaz.gov
PREBID
1/21/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT