Santa Clara Water System Improvements - Phase II Flower Road
BID DATE
04/17/15 - 1:30
AGENCY
Santa Pueblo Tribal
ESTIMATE
n/a
SCOPE
This project consists of the open cut installation of approximately 4,147 linear feet (LF) of 6-inch distribution waterline within the East Village of Santa Clara Pueblo including installation of service connections, fire hydrants and gate valves; connections to the existing water system; and trench width removal of the existing asphalt roadway and replacement with compacted millings. Also included in the work is abandonment of several waterlines and appurtenances throughout the water system. Soder Miller & Assoc 505-473-9211